A new route to the sea
The Raipur–Visakhapatnam Economic Corridor is a 464 km, six-lane, access-controlled highway, Chhattisgarh's first, with about 125 km in the state. It is scheduled for completion by December 2026 and is expected to cut the route from about 597 km to about 465 km, and travel time significantly. For steel, cement, rice, minerals and manufactured goods heading to port, that changes logistics planning (our news report). A faster road only helps if your dispatch, tracking and paperwork keep up.

Save it. Share it with your team.
The short version of this post, ready for your Instagram Story or feed.
The stack
| Layer | What it does |
|---|---|
| GPS and telematics | Live vehicle location, speed, fuel and driver behaviour |
| Transport management system (TMS) | Plans loads and routes, assigns vehicles, tracks trips, calculates freight |
| E-way bill and e-invoice integration | Generates and updates e-way bills from the TMS via the government APIs, no retyping |
| FASTag and toll data | Toll costs and checkpoints per trip, for accurate freight costing |
| Customer tracking links | Shippers see live status without calling the transporter |
| Proof of delivery app | Photo and signature at delivery, which triggers the invoice |
Design notes
- Offline first. Driver apps must work on patchy networks through forest and hill sections and sync later.
- Event-driven tracking. Store GPS pings in a time-series store; raise events (departed, delayed, arrived) rather than making users watch a map.
- Exception alerts. Long stops, route deviation and e-way bill expiry are what managers actually need to see.
- Integrate, don't re-enter. Orders from ERP, e-way bills from the TMS, invoices back to accounting.
How Nexgenex Labs can help
We build TMS platforms, driver apps and dashboards for logistics and supply chain businesses in Chhattisgarh. Get in touch.
Sources
Have a project like this in mind?
Talk To Our Team →


